|
|
|
|
LEADER |
00824nam a22002654a 4500 |
001 |
kwldg000008265 |
003 |
Ministerio de Vivienda y Urbanismo |
005 |
20150225204754.0 |
008 |
140619s1993 ||||||||||||||||||||||||| |
040 |
|
|
|a Ministerio de Vivienda y Urbanismo
|
110 |
2 |
|
|a United Nations.
|b Centre for Human Settlements Habitat
|
245 |
1 |
0 |
|a Endogenous capacity building for the production of binding materials in the construction industry. Selected case studies
|
260 |
|
|
|a Nairobi, Kenya ,
|c 1993
|
300 |
|
|
|a 124 p.
|
650 |
1 |
4 |
|a AFRICA
|
650 |
1 |
4 |
|a CAL
|
650 |
1 |
4 |
|a CASCARA DE ARROZ
|
650 |
1 |
4 |
|a ESTUDIO DE CASOS
|
650 |
1 |
4 |
|a TECNOLOGIA APROPIADA
|
650 |
1 |
4 |
|a MATERIALES DE CONSTRUCCION
|
920 |
|
|
|a 69.003.1
|
921 |
|
|
|a N118 e
|
923 |
|
|
|a 69.003.1/N118 e
|
930 |
|
|
|a Inglés
|
999 |
|
|
|c 13983
|d 13983
|